06/25/06 - Sunday
Bug protection...that is, protection FROM bugs
Notes:
- Rainy. Again. Another flood watch in effect.
- Plan for day: Chris some tasks while Cass tasks in yurt. Then test- is generator use (hammer drill) ok with Cass in opened yurt? (Hope so!) Finish non-ledge footings, and then more hammer drilling. Tomorrow morn do more cement together.
- By time got test done, and lunch was 1:40pm. Can't skip planning 2nd wk in row. Opted to focus on gen use/hammer drill today, cement tomorrow.
- Neighbor chainsawing on Oregon Falls and driving up?
226.25 Team onsite tent setup
- Chris hiked up, took tent down, transported tent and chair down
- Set it back up, at turnaround
- Got nasty bleeding bugbite
- Time: 2hrs
275.04 Materials transport
- hay up top, misc supplies up from vehicles
- Time: 15min
213.01 Footings
- Chris generator and hammer drilling
- Didn't have instructions on Kwikset hydraulic cement stuff
- Way frickin humid n soaked
- Stinky ledge! Drilled dust smelled like dead fish.
- Cass bummed to spend day stuck in yurt, but for a good cause.
- Chris continued his Toad saving mission
- Norm the snake loafing around in grasses
- Hammer drilled 11 plus finished one from earlier in yr
- Cut 12 rebar
- Time: 5.75 hrs
300.28 Shower arrangements onsite
- another trial
- filled clear jug (as much as could-darn thing has a leak and must be returned!) and set in black tray
- Time: negligible
213.01 Posts + Beams(Deck)
- Time: 0.75hrs
- Put up a second 2*8 for angled beam
213.27 (MLA/Deck) shape ground for drainage/lay gravel/stone over site
- Chris cut strings out of way for Cass
- Time: 0.25hrs
|