1/1/09 | 288.08 | Split and stack wood | 1.25 |   |
1/1/09 | 742.01 | JaBoSTH: Non-Quackers | 0.5 |   |
1/1/09 | 0 | Notes | 0 |   |
1/2/09 | 326.03 | PA temporary skirting | 1.25 |   |
1/2/09 | 310.69 | Snow Removal ala Chris | 1.5 |   |
1/2/09 | 742.01 | JaBoSTH: Non-Quackers | 0.5 | calculations for PH based on chris inventory, measuring luan in PA. possibly use luan for gen room walls and 3/8 ply for floors under metal? |
1/2/09 | 0 | Notes | 0 |   |
1/3/09 | 0 | Notes | 0 | Chris' knee is all messed up. C&C hash out a 2009 schedule. |
1/3/09 | 310.96 | Snow Removal ala Cass | 0.75 |   |
1/3/09 | 213.503 | PH: walls/ceiling install | 0.5 |   |
1/3/09 | 310.69 | Snow Removal ala Chris | 0.5 |   |
1/4/09 | 0 | Notes | 0 | Chris' knee still messed up. more scheduling done. |
1/4/09 | 300.45 | Woodstove maintenance/problems | 1 |   |
1/4/09 | 310.96 | Snow Removal ala Cass | 1.75 |   |
1/4/09 | 306.01 | Determine tasks she can do during week alone | 0.5 |   |
1/4/09 | 288.08 | Split and stack wood | 0.25 |   |
1/4/09 | 275.04 | Materials transport/inventory | 0.5 | insulation up to US |
1/5/09 | 0 | Notes | 0 |   |
1/6/09 | 310.96 | Snow Removal ala Cass | 0.5 | snow off deck (slid off roofs) and deaing with ice |
1/6/09 | 329.02 | Construct walls and loft - 30' yurt: wallboards | 0.5 | (or door casing, if was a sep task) measuring and marking avail stock |
1/6/09 | 213.123 | US: ceiling install | 0.5 | finished marking boards for ceiling. lving marking for access panel til after these installed |
1/6/09 | 742.01 | JaBoSTH: Non-Quackers | 0.25 | was going to do wallboards and cleaned up some then realized too cold and did deck work to move and ...no one thing 15 mins. |
1/6/09 | 0 | Notes | 0 |   |
1/7/09 | 0 | Notes | 0 | cass continues doing updating and tasks for new yr |
1/7/09 | 310.96 | Snow Removal ala Cass | 2.25 | soaked. shoveling PA heavy snow and sleet and rain. cass takes three session to do tho, since kept getting soaked and wanted to dry jacket and shirts before heading back out. lots of spreadsheet work to do anyway |
1/8/09 | 0 | Notes | 0 | cass continues lots of non building tasks and normal thurs stuff....argh |
1/8/09 | 310.96 | Snow Removal ala Cass | 2.5 | park ave (way easier than yest!) and partof deck(terribly difficult, ice under all, layers and crust and fluffy on top, ice buildup between boards up above deck, jarring). |
1/9/09 | 288.08 | Split and stack wood | 0.25 |   |
1/9/09 | 310.69 | Snow Removal ala Chris | 1.75 |   |
1/9/09 | 310.96 | Snow Removal ala Cass | 0.5 |   |
1/9/09 | 213.122 | US: insulate roof | 0.25 | last reflectix is in |
1/9/09 | 275.04 | Materials transport/inventory | 0.25 |   |
1/10/09 | 0 | Notes | 0 | Chris wakes to a near-blinding shoulder pain which takes him out of commission for the day. |
1/10/09 | 288.08 | Split and stack wood | 1 | C&C work out getting some firewood. later chris does some one-armed splitting |
1/10/09 | 329.16 | Sitework Plans&Figuring | 2 | planning cabinets, electric and RF filling |
1/11/09 | 310.69 | Snow Removal ala Chris | 3 | park ave, plowing, and deck. running out of places to put snow. yikes! |
1/11/09 | 288.08 | Split and stack wood | 1.25 |   |
1/11/09 | 310.96 | Snow Removal ala Cass | 1 | park ave |
1/11/09 | 0 | Notes | 0 | starts out snowy but gets sunny in the afternoon |
1/12/09 | 0 | Notes | 0 | still not into schedule. lots of org & catchup. sunny but cold weather. |
1/12/09 | 310.96 | Snow Removal ala Cass | 3 | snow clearing on deck and off MLA roofs |
1/13/09 | 0 | Notes | 0 | terrible day.cass v not-doing-good.grey dark. got too cold and due to not having lots of reasonable work(either too cold, or unsafe), did lots of 2009 org tasks in payurt. cass proud of herself for at least pushing thru org taaks |
1/13/09 | 310.96 | Snow Removal ala Cass | 1.25 | snow (not all ice) off MLA roofs, woodshed, boiler and US |
1/14/09 | 0 | Notes | 0 | sunny and clear day, but terribly windy and cold. cass not-doing-good. pretty much same situation as yest. |
1/14/09 | 310.96 | Snow Removal ala Cass | 1.25 | snow (not much but still had to be done) off PA. didn't get up to MLA. shoveled snow off and away from sol r pole, since chris asked for thast, to pull out the hay |
1/14/09 | 742.01 | JaBoSTH: Non-Quackers | 0.25 | pulling various tools out of snow and into Jacque til Chris can put elsewhere. |
1/15/09 | 0 | Notes | 0 | sunny and clear day, but quite cold again. cass bit better but still struggling with various smoke, org2009, other reg thurs tasks |
1/15/09 | 310.96 | Snow Removal ala Cass | 0.75 | salting entryway. and snow (not much but still had to be done) off deck |
1/15/09 | 213.36 | Site cleanup (general and for Cass safety) | 0.25 | various things in MLA, together for PA, and/or put away |
1/15/09 | 329.01 | Plumbing rough-in MLA: DWV | 0.25 | chiseling and fitting board next to sink |
1/16/09 | 288.08 | Split and stack wood | 1 |   |
1/16/09 | 300.45 | Woodstove maintenance/problems | 0.25 |   |
1/16/09 | 310.69 | Snow Removal ala Chris | 0.25 |   |
1/17/09 | 288.08 | Split and stack wood | 2 |   |
1/17/09 | 239.12 | Solar: source to Power House | 0.75 |   |
1/17/09 | 742.01 | JaBoSTH: Non-Quackers | 0.5 |   |
1/17/09 | 300.45 | Woodstove maintenance/problems | 0.75 |   |
1/17/09 | 213.123 | US: ceiling install | 2 |   |
1/17/09 | 310.96 | Snow Removal ala Cass | 1.25 |   |
1/17/09 | 306.02 | Test on safety: materials and tools | 0.25 |   |
1/17/09 | 329.02 | Construct walls and loft - 30' yurt: wallboards | 0.75 |   |
1/17/09 | 213.122 | US: insulate roof | 1.25 | yippee (cough, sneeze, blink-blink) this subtask is DONE! |
1/18/09 | 310.69 | Snow Removal ala Chris | 3.75 | PA, MLA, and Main Drive |
1/18/09 | 213.24 | TV loft adaptation | 0.75 |   |
1/18/09 | 300.52 | Clean sediment filter | 0.75 |   |
1/18/09 | 300.58 | Toilet sweating: clean&change | 0.25 |   |
1/18/09 | 306.05 | List of tasks for week | 3.75 | we got us a E-lec-teronik task list. spent time making a dbase on phones so we don't have to keep making weekly paper lists. this will save time on the coming weeks. |
1/18/09 | 310.96 | Snow Removal ala Cass | 1 | slip sliding shoveling @ PA |
1/18/09 | 213.121 | US: insulate/close floor | 1.5 | reflectix in the platform. |
1/19/09 | 310.69 | Snow Removal ala Chris | 1 |   |
1/19/09 | 213.121 | US: insulate/close floor | 1.75 | almost done |
1/19/09 | 300.52 | Clean sediment filter | 0.5 | soapy residue |
1/19/09 | 310.96 | Snow Removal ala Cass | 2.25 |   |
1/19/09 | 213.65 | Electrical rough-in (30' yurt) | 0.25 |   |
1/19/09 | 213.24 | TV loft adaptation | 1.75 | woohoo. progress. ready to cut |
1/19/09 | 213.36 | Site cleanup (general and for Cass safety) | 0.25 |   |
1/19/09 | 288.08 | Split and stack wood | 0.25 |   |
1/19/09 | 0 | Notes | 0 | sunny day and "tropical" at 20! cnc getting schedule down....well, chris forgets and shows up late for snackbreak. but all is ok and orked out. byebye fun is had in afternoon and not as much site work....oh well. short sunday due to chris having to lv for long drive to work. |
1/20/09 | 0 | Notes | 0 | Balmy! Tropical! (20F…) Smoky!Stinky!(woodstove nastiness sucks for cass, pourig pouring out smoke and opts for no fire til later in day) |
1/20/09 | 310.96 | Snow Removal ala Cass | 2.5 | off MLA roofs, including some treacherous ice sheets that just barely missed cass as they zipped off. Also US and WS#1, also put sheet metal pcs by US away |
1/21/09 | 0 | Notes | 0 | started sunny but no such luck that it lasted. quite cold without sun. electric boot socks seem to be duds and no help. cass gets more files n catchup work in Park Ave done. not enough time in day!!!!!!! |
1/21/09 | 310.96 | Snow Removal ala Cass | 0.5 | ParkAve finished up |
1/21/09 | 742.01 | JaBoSTH: Non-Quackers | 0.25 | fitting sink wall top and seeing where adj needed. seeing what needed in US and getting organized |
1/21/09 | 213.36 | Site cleanup (general and for Cass safety) | 0.5 | cleaning up various stuff laying in US, vac and new paper. |
1/21/09 | 213.123 | US: ceiling install | 0.25 | tools all collected & by door |
1/22/09 | 0 | Notes | 0 | grey but lots warmer (well...comparatively...) AT&T is awful. keep showing bars and data signal and yet not letting cass connect and get some ordering done. cass realizes the take/get prep takes an hour and forgot to be taking supps all the while. greatly delayed AM. made best of it but still... and, with weird week, keeping to thurs cleaning so little site time. wouldve been good day to crank as it was "warmer" |
1/22/09 | 310.96 | Snow Removal ala Cass | 0.5 | enough snow overnight to require some work, just enough to be annoying |
1/22/09 | 213.123 | US: ceiling install | 2.25 | tools and such setup in US. boards PIA trying to shave off so they fit w/o scrapingwalls. oh well. got figured out good enough and angle part close to done |
1/23/09 | 0 | Notes | 0 | grey and "warm" again. cass still gets cold in afternoon session, but conditions are still much more tolerable working than past weeks. |
1/23/09 | 213.123 | US: ceiling install | 4 | boards going up angle and three done across top. discovered joists are not even, is a royal PIA, ended up chiseling out for lowest. working under insulation, getting everywhere. sucks. |
1/24/09 | 300.45 | Woodstove maintenance/problems | 0.25 | outside pipe cleaning |
1/24/09 | 288.08 | Split and stack wood | 0.75 |   |
1/24/09 | 310.69 | Snow Removal ala Chris | 0.5 | Enduvtha Dr. |
1/24/09 | 213.121 | US: insulate/close floor | 1 |   |
1/24/09 | 329.02 | Construct walls and loft - 30' yurt: wallboards | 0.5 | cut aspen @ house |
1/24/09 | 666 | Dealing with Problems at Hellhouse, Which We Can't Get Rid of Because We're Not F'ing Done Building Yet! (DwPaHWWCGRoBWNFDBY!) | 1.5 | ice melt from roof leaking thru windowsill into 1st floor bathroom. made a drainage from aluminum foil, goes to tub. |
1/24/09 | 0 | Notes | 0 | messed up routines (that weren't even set yet) as this is actually cnc friday. grrr :( Sun but windy and turning cold |
1/24/09 | 213.123 | US: ceiling install | 0.25 | finished board installed yst, got levels, got really really really frigid hurting hands n feet by time had started on this |
1/24/09 | 329.02 | Construct walls and loft - 30' yurt: wallboards | 0.75 | measured/marked new board sections for sink top |
1/24/09 | 213.69 | Construct walls and loft - 30' yurt: floorboards | 0.25 | moved ladder and got up onloft started getting fit. gtta ask chris if should get new board and shim wallboards to round out |
1/24/09 | 742.02 | JaBoSTH: Quackers | 0.25 | had to be done but... jeebus *#$?!j*! turkeys, dropping turds all over park ave. "wait til they freeze and shovel them off". so, cass did. rather that than getting on boot bottoms and into yurt. eww. |
1/25/09 | 275.04 | Materials transport/inventory | 0.25 |   |
1/25/09 | 310.69 | Snow Removal ala Chris | 0.75 |   |
1/25/09 | 329.02 | Construct walls and loft - 30' yurt: wallboards | 1 |   |
1/25/09 | 213.122 | US: insulate roof | 1 |   |
1/25/09 | 306.05 | List of tasks for week | 0.75 |   |
1/25/09 | 239.16 | Wiring: PH to MLA | 0.5 |   |
1/25/09 | 213.69 | Construct walls and loft - 30' yurt: floorboards | 0.25 |   |
1/25/09 | 329.02 | Construct walls and loft - 30' yurt: wallboards | 1 |   |
1/25/09 | 310.69 | Snow Removal ala Chris | 0.5 |   |
1/25/09 | 329.11 | Electrical: US to MLA | 0.25 |   |
1/25/09 | 213.123 | US: ceiling install | 1 |   |
1/26/09 | 0 | Notes | 0 | brr brr. very cold hands n toes. stupid stove is blasting smoke, nasty. having door n dome open in below zerotemps is pretty awful. need about 2hrs a day allotted for smoke mgmnt. cass carefully balances feet over stove in attempts to warm them later in day |
1/26/09 | 213.123 | US: ceiling install | 2.25 | oh my gods freakin cold work. was ok to start w/sun coming in but then so cold, cass losing balance. but got almost all up. next is chiseling 2 more for north side |
1/26/09 | 329.02 | Construct walls and loft - 30' yurt: wallboards | 1 | aspen installing for desk electronic cabinet. v cold after only one hr. urgh |
1/27/09 | 0 | Notes | 0 | sunny. still cold. cass can hardly feel her toes after outdoor work session. neck and jaw hurt a lot....could be some detox/reaction or...could be installing ceiling? |
1/27/09 | 213.123 | US: ceiling install | 2.25 | rest of short boards chiseled and instlled. measured/marked final board. the figuring for access panel boards. chose those and got measurements. have plan sketched out to implement |
1/27/09 | 329.16 | Sitework Plans&Figuring | 1.5 | gathering info (or starting to....) for appliances list. pretty old info. argh! |
1/27/09 | 213.19 | Plumbing finishing 30' | 0.25 | found pdf and did prelim look and wrote notes |
1/28/09 | 0 | Notes | 0 | grey. dark. snow (and sleet for bit midday) all day and into evening. cass wakes to extremely sore/almost can't move neck. ack!! |
1/28/09 | 310.96 | Snow Removal ala Cass | 3.75 | shoveling in a blizzard/mix of a storm. had to be done in three separate sessions, kept having to come in a dry out |
1/29/09 | 0 | Notes | 0 | sunny. too bad weather decided to get "warm" on a thursday when so much else to do, and a ton of shoveling too. cass neck/shoulders/head really sore still, but somewhat better as she is now able to lay down without excruciating pain. chris looks into turkey deterrent, as cass' request. damn birds like to socialize and shit on park ave. at house (where chris was working for day) some horses showed up and left a large dump in that driveway |
1/29/09 | 310.96 | Snow Removal ala Cass | 5 | still much more to do! |
1/30/09 | 310.69 | Snow Removal ala Chris | 1.25 |   |
1/30/09 | 213.65 | Electrical rough-in (30' yurt) | 0.25 | taping wires |
1/30/09 | 0 | Notes | 0 | cnc friday stuff, pushed back, so that chris can plow. |
1/30/09 | 310.96 | Snow Removal ala Cass | 1.25 | more of park ave, careful not to step on turkey turds. also spreading salt on thicker ice parts |
1/31/09 | 0 | Notes | 0 | Our neighbor and his friend skied/snowboarded through our land today. They indicated getting disoriented and not intending to come that close to PA. nevertheless, having had others violate the no tresspassing warning - with detrimental results - C&C were quite on edge. seems there was no unsafe exposure but the stress was most definitely unwelcome! The only reason there was no unsafe exposre was because we kept Cass inside! otherwise, it'd have been terrible. as it was, it was very detrimental-wrecked out site work time! they took away a good portion of our afternoon! |
1/31/09 | 275.04 | Materials transport/inventory | 0.25 |   |
1/31/09 | 288.08 | Split and stack wood | 1.25 |   |
1/31/09 | 310.69 | Snow Removal ala Chris | 5.5 | digging out vermoose and doing shed roofs. |
1/31/09 | 310.17 | Plow maintenance | 0.5 | chain fix |
1/31/09 | 300.45 | Woodstove maintenance/problems | 1 |   |
1/31/09 | 213.121 | US: insulate/close floor | 0.25 |   |
1/31/09 | 310.96 | Snow Removal ala Cass | 0.25 |   |
1/31/09 | 329.11 | Electrical: US to MLA | 0.25 |   |
1/31/09 | 329.02 | Construct walls and loft - 30' yurt: wallboards | 1.5 |   |
1/31/09 | 213.123 | US: ceiling install | 0.25 |   |
1/31/09 | 742.02 | JaBoSTH: Quackers | 1 | Dealing with tresspassing neighbors. Happened at end of our lunch break and cass was confined in yurt, chris had to track down and go make sure they left, then wait enough time for air to clear before he could come back in. they were right on logging path above the PA yurt |
1/31/09 | 306.05 | List of tasks for week | 0.5 |   |