Chris brings some kinda sniffly bug home from Texas, so he and Cass sniffle thru a rainy indoor workday.
8/2/08
329.02
Construct walls and loft - 30' yurt: wallboards
7.5
boards cut and installed
8/2/08
213.5
Construct power house
0.5
marked side fascia for install
8/2/08
306.01
Determine tasks she can do during week alone
0.25
8/2/08
742.01
JaBoSTH: Non-Quackers
0.25
8/2/08
213.24
TV loft adaptation
3
jost cut and removed
8/2/08
275.04
Materials transport/inventory
1
solar hot water heater
8/2/08
329.04
Loft access Building
1.25
sand a post or two
8/2/08
213.65
Electrical rough-in (30' yurt)
1.5
wired boxes
8/3/08
329.02
Construct walls and loft - 30' yurt: wallboards
1
mark and cut and install walboards
8/3/08
213.5
Construct power house
3.5
installed fascia
8/3/08
213.82
Radiant flooring 30': loops installed
0.5
more pipe runs
8/3/08
213.76
Power House: build walkway/access from road
0.25
digging dirt
8/3/08
305.18
Tick, tick
0.25
wacked weeds
8/3/08
288.09
Cut and store downed trees
0.25
new splitter rocks!
8/1/08
0
Notes
0
muggy humid, sunny sky with clouds cnc get up quite early for a friday, since chris had to drive up top with supplies and getting home last night before midnight really helped!
8/1/08
300.55
Woodstove, Heat & Showering '08
0.5
wow! an sort of warm shower!
8/1/08
329.02
Construct walls and loft - 30' yurt: wallboards
4.75
measuring, calculating. marking the 10' boards chris bought. got all inside. installed a couple boards in office.
8/1/08
213.5
Construct power house
0.75
watershield cut edges fascia*2, mark and hand cut more lookout rafters and another joist for wall, seal those edges
8/1/08
213.12
Utility shed built
1
watershield backs of new 6' shiplap chris bought
8/1/08
742.01
JaBoSTH: Non-Quackers
0.25
setup and shutdown
8/8/08
239.19
2nd Site Visit and Review
2.5
Dave and Justis from USA Solar Store visit to review off grid plans and update quotes. Rain pours down but enough sun peeks through to allow an assessment of solar potential.
8/8/08
275.04
Materials transport/inventory
0.25
review RF packages to make sure all is there.
8/9/08
275.04
Materials transport/inventory
3
boards up to mla. plywood and doors finally out of Xtrailer.
8/9/08
213.36
Site cleanup (general and for Cass safety)
0.75
8/9/08
306.01
Determine tasks she can do during week alone
1.25
8/9/08
329.02
Construct walls and loft - 30' yurt: wallboards
3.5
cutting, marking & installing
8/9/08
300.55
Woodstove, Heat & Showering '08
1
including a camp heatup as ghetto solr didn't work
8/9/08
742.01
JaBoSTH: Non-Quackers
0.5
nonQUACK
8/9/08
213.12
Utility shed built
3.75
shiplapping. cutting and installing plywood walls.
8/9/08
305.03
Mosquito dunks
0.5
8/9/08
213.24
TV loft adaptation
0.5
drilled mounting plate and attached for test
8/10/08
275.04
Materials transport/inventory
0.5
1*12-12 from hellhouse to mla via xterra and feet.
8/10/08
329.02
Construct walls and loft - 30' yurt: wallboards
0.75
cuttin' n' installin' boards
8/10/08
213.12
Utility shed built
1.5
shiplap sealing
8/10/08
213.5
Construct power house
0.75
shiplap sealing and fascia cutting
8/10/08
0
Notes
0
the sheckie-repaired battery works like a charm
8/10/08
325.02
Baking Soda MLA Shrooms
0.25
8/10/08
545.04
YIDDEE HSODIF: Repair
1
waterbars on the entire drive
8/10/08
213.82
Radiant flooring 30': loops installed
1.25
more pipe
8/10/08
306.02
Test on safety: materials and tools
0.25
8/10/08
213.65
Electrical rough-in (30' yurt)
0.5
wiring
8/10/08
213.24
TV loft adaptation
0.75
the tv fits - yippee!
8/4/08
0
Notes
0
dark clouds, sun in eve later afternoon, too late for hot water. hello dragonflies! eat up the skeeters, come'on, you can do it! and a hummingbird seen too, flitting about the MLA deck enjoying various greenery, or rather flowering plants.
8/4/08
213.5
Construct power house
1.75
got supplies together and went down to ph. couldnt get ladder unstuck. climbed carefully up and down to install the remaining lookout rafters as best as could. couldnt install last joist on wall...too long. marked that and end fascias for cutting, cleaned up and carted supplies back uphill. ph work today was gross gross wet from yest rains and filthy yucky.
8/4/08
213.12
Utility shed built
1.75
stained shiplap n got inside
8/4/08
300.55
Woodstove, Heat & Showering '08
0.25
at least wasnt a cold screaming shower, slightly warmer than water would have been from inside. oh well.
8/4/08
742.01
JaBoSTH: Non-Quackers
0.25
setup and shutdown
8/4/08
329.02
Construct walls and loft - 30' yurt: wallboards
3.5
more wallboards on Z, hand sawing not great but cass contd
8/4/08
213.36
Site cleanup (general and for Cass safety)
0.25
vaccuuming, changing shoe covers
8/4/08
213.71
Walls - 30' yurt: sand and finish
1
staining the posts and window parts of step wall
8/5/08
0
Notes
0
cass disappointed in herself for gettingher hopes up: weather report kept saying this would be a nice day. sun in AM seemed encouraging. but as getting set to do outdoor work dark ominous clouds and day sucked cass also very struggling, perhaps molds again
8/5/08
300.55
Woodstove, Heat & Showering '08
0.25
at least wasnt a cold screaming shower, slightly warmer than water would have been from inside. oh well.
8/5/08
213.12
Utility shed built
0.25
was going to put top coat on shiplap but dark couds and such meant setup was wasted.
8/5/08
329.02
Construct walls and loft - 30' yurt: wallboards
5.75
Y started and bath wall started. hand sawing is awful. had to do some inside since wet out. banged up one board and have to redo. tall boards bit tricky to work with, a few quite warped, used ratchet straps
8/5/08
213.71
Walls - 30' yurt: sand and finish
1.5
top coat onto the posts and window parts of step wall. had leftover and didnt want to waste. top coat onto back of step1, and wall of step7 is going to have two cooats matte because had extra and shouldnt look too different in that place. sanded wall and applied.
8/6/08
0
Notes
0
rain all day...with only a short break in evening when cass thought it was clearing, but storms started up again. cold cold shower. rough start to morning, cass still struggling and sleeps in since rain and darkness anyway, and she needs more sleep. starting to feel some better in evening.
8/6/08
329.02
Construct walls and loft - 30' yurt: wallboards
5.5
hand cutting boards and measuring and marking for boards on Y around windows. screwed up a board and had to get another. put up couple other boards too.
8/7/08
0
Notes
0
severely intense storms today! around 11am cass noticed was clearish, thought was going to be sunny, hot and woohoo...looking fwd to hot shower, got water all setup and thunder started up.
hail, rains, loud-loud-loud, windy and cold. then tiny break and sun, then dark again and storm. back and forth all day/eve.
Happy Birthday Chris! Love, Cass
8/7/08
329.02
Construct walls and loft - 30' yurt: wallboards
2.75
boards for juncture of 6 and 4 steps, installed one more onto 6. marked a few more boards for chris to cut. installed last avail arc board. screwed down the shelf section that was pulling up.
8/7/08
329.04
Loft access Building
0.5
lined up #6 and #4 and predrilled for assembly later.
8/7/08
213.71
Walls - 30' yurt: sand and finish
1
sanded and wiped back of #6 step and shelf
8/14/08
275.04
Materials transport/inventory
1.5
hdsma
8/15/08
275.04
Materials transport/inventory
1
8/15/08
213.24
TV loft adaptation
0.25
cut @ house
8/16/08
300.55
Woodstove, Heat & Showering '08
0.75
prep for setup of sunforce
8/16/08
329.02
Construct walls and loft - 30' yurt: wallboards
4
cut boards & installed
8/16/08
213.65
Electrical rough-in (30' yurt)
2
box install in office
8/16/08
325.02
Baking Soda MLA Shrooms
0.25
8/16/08
306.01
Determine tasks she can do during week alone
0.5
8/16/08
213.5
Construct power house
0.5
8/16/08
213.82
Radiant flooring 30': loops installed
4.25
loops almost done
8/17/08
300.55
Woodstove, Heat & Showering '08
0.75
8/17/08
329.05
Loft Bathroom Windows
0.25
try cutting plexiglass with saw. hey, it worked and fits.
8/17/08
213.5
Construct power house
0.5
8/17/08
213.12
Utility shed built
2.25
peaks shiplaps test-fit and cutout. chris puts more nails in plywood. when explaining to cass how to do shiplap and brown goo etc for week...cass goes mega downhill. hmmm... she was looking forward to getting sides finished. now what...
8/17/08
329.02
Construct walls and loft - 30' yurt: wallboards
3.25
chris cuts some boards. cass installs some boards. bathroom closet boards all up. cnc figger and finalize venting layout for under loft.
8/17/08
213.65
Electrical rough-in (30' yurt)
0.25
8/17/08
213.36
Site cleanup (general and for Cass safety)
0.25
8/17/08
742.02
JaBoSTH: Quackers
0.5
fix hole in gippee
8/17/08
288.09
Cut and store downed trees
0.5
chris works on the pile by WS1
8/8/08
0
Notes
0
8/9/08
0
Notes
0
8/10/08
0
Notes
0
8/11/08
0
Notes
0
another cold grey dark rainy foggy ... long underwear kinda day with sweatshirt too. never stopped raining and/or drizzling all day long. brrrrrrbrrrrbrrrrr frigid icy showering.
8/11/08
329.02
Construct walls and loft - 30' yurt: wallboards
6
boards had to be cut by hand, chiseled here and there, finagled into place. ugh. installed boards onto the small D wall, onto Y wall, in office and storage closet, and later, began in bath closet.
8/11/08
742.01
JaBoSTH: Non-Quackers
0.5
downloading and trying to get palm to read, then reading thru... the solar quote.
8/11/08
213.36
Site cleanup (general and for Cass safety)
0.5
relocated scraps out of bath closet and into storage closet, and a bit on paper behind Z
8/12/08
0
Notes
0
long underwear today too. but some sunny spells midmorning. thought it might be a day without rain, but nope.
8/12/08
329.02
Construct walls and loft - 30' yurt: wallboards
5
handsawing boards again. got most of bath closet installed, making do with what have onhand. not great quality boards, but will be shelving and hidden mostly. need few more boards to finish
8/12/08
742.01
JaBoSTH: Non-Quackers
0.25
setup/shutdown
8/12/08
329.04
Loft access Building
1.25
sanding window-post/stud parts
8/12/08
213.5
Construct power house
1.75
stained some, watershielded started but raining started and rushed about to cover and later wiped off and stacked
8/13/08
0
Notes
0
sunny until afternoon. buggy tho. otherwise, if it werent for bugs the day would be really pretty and nice. rained later though.
cass frustrated by bugs and mistakenly takes chance on bug lotion vs bugshirt. ewww awful yucky. not good thereafter.
8/13/08
329.02
Construct walls and loft - 30' yurt: wallboards
0.25
measured and marked long pine board
8/13/08
213.71
Walls - 30' yurt: sand and finish
0.5
sanding and wiping the long pine board
8/13/08
742.01
JaBoSTH: Non-Quackers
0.25
rain, windows, argh
8/13/08
213.5
Construct power house
5.25
watershielded rest and then stained all. as was finishing stain, little drizzle but went over. then later, when under 30 it started raining and rushed about to cover and later wiped off and stacked
8/13/08
213.82
Radiant flooring 30': loops installed
1.5
pipe is where needs to be, just have to do the 90s and header, tighten couplings
8/13/08
300.55
Woodstove, Heat & Showering '08
0.25
8/14/08
0
Notes
0
weird day schedule-wise, cnc talk earlier in day as chris en route to airport. but, he gets home fairly reasonable, right before midnight. with boards.
8/14/08
213.5
Construct power house
3.25
top coat onto many shiplaps, carefully keeping eye on sky and only a couple boards out at a time, putting away into screenhouse as done, laid some out onto loft too.
8/15/08
0
Notes
0
cnc up early, nice to have chris home reasonable hour thursdays.
started promising with lots of sun, but by breakfast time, was cloudy. before cnc got up top had rained. drizzled. then rained most of afternoon. brrr brrr brrr brrr brrr cold showering
att n unicel suck!!!! cass keeps retrying to get a signal to hold long enough to send a simple little notice email, takes repeated retries until it finally sends. whew...or, well...until chris tells her he got three copies - 3! frickin frickin stupid services. according to sending end, it only sent one time. once. yet got delivered three times. arghhhhhhhhhhh! wft!!?! this has happened before and there seems to be no way to identify when it will happen or not. retrying for a signal happens ALL the time, but sometimes the services send when they tell you it couldnt send, and theres no way to know until someone on other end says....i got it multiple times. argh!!!!
8/15/08
329.02
Construct walls and loft - 30' yurt: wallboards
5.25
measured and marked new boards, hand sawed a couple to install so could get next measurements for ripcuts.
8/15/08
329.05
Loft Bathroom Windows
0.75
fine tuning and installing aspen
8/23/08
275.04
Materials transport/inventory
0.75
8/23/08
305.01
Garlic spray
1.5
mosquitos suck
8/23/08
213.5
Construct power house
0.75
fascia not an easy fit
8/23/08
742.01
JaBoSTH: Non-Quackers
0.5
8/23/08
329.02
Construct walls and loft - 30' yurt: wallboards
1.25
8/23/08
213.12
Utility shed built
5.25
sealed roof and walls. cut roof panels
8/23/08
300.55
Woodstove, Heat & Showering '08
0.5
8/23/08
306.01
Determine tasks she can do during week alone
0.5
8/23/08
213.7
Construct walls and loft - 30' yurt: mouldings
1.25
8/23/08
329.05
Loft Bathroom Windows
0.25
8/8/08
0
Notes
0
8/9/08
0
Notes
0
8/10/08
0
Notes
0
8/18/08
0
Notes
0
sunny morning. and afternoon. back to summer temps and humid again. didnt start storming til evening. cass runs down at night in lightning storm getting to p.a. just as rain started.
skeeters plentiful and irritating and awful.
8/16/08
0
Notes
0
cnc tired. sunny morning and cnc hopeful. do typical sat am tasks in p.a. yurt including water setup and ....grrr... by time up top, skies are looking sketchy. chris didnt get thru cutting all boards before large raindrops started. cnc get all inside and downpour. including hail! bouncing onto and up off deck.
8/17/08
0
Notes
0
argh. sunday morns take so much time. chris frustrated. but...weather is deemed gorgeous by both c's. except for the skeeters it'd be perfect! cass gets really messed up over by/in utility shed. cnc have to rethink plan to setup the solar hw today since is all new parts and she's already messed up.
8/18/08
213.71
Walls - 30' yurt: sand and finish
1.75
sanding and then gloss coat onto: loftshelf underboard, aspen for one window, and step #6 back
8/18/08
213.12
Utility shed built
1.75
all avail boards now fully sealed/coated
8/18/08
300.55
Woodstove, Heat & Showering '08
0.5
tried new way of emptying water in doohickie in morn after has had an hour or so (nice n hot) into clear jug as refill. then refill/empty again later so is some to get hot tomorrow am. whether this or warmer air temps...cass ends up with warmest non-poocham shower in well over a month!
8/18/08
329.05
Loft Bathroom Windows
1
installing more aspen.
8/18/08
329.02
Construct walls and loft - 30' yurt: wallboards
2
in office: trying to pull cup out of board under charging cabinet. tried drillingout for a box, so that could cutout, but drill splintered wood (isnt supposed to, prob shouldve used forcner bit for cleaner cut?). installed one board by bathroom on Y but due to low lighting stopped and didnt install next in case looks weird.
8/19/08
0
Notes
0
rainy, stormy and gloomy until later in afternoon. around 2pm was clearish, blustery and very autumn-like. red trees up on ridge. numerous yellows. very cold air.
cass has lots of phone calls to make for various orders and product problems. also, spent am in pa yurt to catch up on some spreadsheet work since rainy anyway.
screaming, screaming, dangerous cold shower
8/19/08
329.02
Construct walls and loft - 30' yurt: wallboards
3.25
took waaaaaay too long to get cutout for electrical box on arc. oh well. and a few other boards on. discovered feathering splits in one board and had to demote.
8/19/08
329.04
Loft access Building
2
sanding posts/window parts. sawdust in eyes on skin. picked a bad day to tackle this tho....
8/19/08
300.55
Woodstove, Heat & Showering '08
0.25
was going to use whatever water could get out of doohickie because prob warmer than inside water, but some gross something was in emptied water, had to dump it and wash container.
8/19/08
329.05
Loft Bathroom Windows
1
this task sucks. is taking forever, aspen not fitting but not by enough for cuttng, nails not going in or tricky and banging up. argh. oh well.
8/19/08
742.01
JaBoSTH: Non-Quackers
0.25
windows setup and shutdown
8/20/08
300.55
Woodstove, Heat & Showering '08
1.25
non-chlorine bleach. pipes and jugs. rinse-outs in AM. don't normally allocate time in AM for filling water jugs and doohickie, but this is maintenance out of norm
8/20/08
742.01
JaBoSTH: Non-Quackers
0.75
windows setup and shutdown
also time spent misc: putting away test items and marking vent on wall
later, stain and top coat on cut parts of peaks for US and PH, not enough to separate out time
8/20/08
329.04
Loft access Building
2.25
sanding more. took smaller steps outside. wore glasses but no mask. thought was ok til later when congested and itchy.
8/20/08
213.24
TV loft adaptation
2.75
sanding, stain and top coat onto parts chris gave on wkend
later, took apart the two floorboards for lid and rejiggered and anchored with molding strips. if chris likes, can refine
8/20/08
213.71
Walls - 30' yurt: sand and finish
1
sanded 1st coat. applied 2nd coat matte on: underboard for shelf, window, steps 6+7 backs
8/20/08
329.05
Loft Bathroom Windows
1.25
more f-ing around with the aspen which often doesnt fit right but is not off by enough to trim with tools onhand, and aspen is fibrous andnot easy to trim anyway. nails prob. argh. discouraging crappy work. after jammed a pc in wrong and cant get out and nail in wrongplace, quit.
8/20/08
0
Notes
0
did not rain! clearish weather, then cloudy but thin clouds, breezy, nice enough. wish could do garlic and zap the skeeters tho....
8/21/08
300.55
Woodstove, Heat & Showering '08
0.5
8/21/08
742.01
JaBoSTH: Non-Quackers
0.5
misc tasks, windows, and finding paint for doors
8/21/08
329.05
Loft Bathroom Windows
0.75
installing plexiglass and aspen in front of, except two nails stubborn, left for chris
8/21/08
213.36
Site cleanup (general and for Cass safety)
2.25
cleanup on loft, around scraps, all kinds cleanup, burnable scraps down to p.a.
8/21/08
213.69
Construct walls and loft - 30' yurt: floorboards
0.25
marking for cutting
8/21/08
0
Notes
0
another non-rainy day. nice! wish chris was here too. almost summery!
8/22/08
0
Notes
0
chris back past 5am. sleep for about 4hrs and then cnc up and at it. another non-rainy day and summery. nice. would be even nicer if it wasnt a house tasks day.
8/22/08
742.01
JaBoSTH: Non-Quackers
0.25
setup n shutdown
8/22/08
0
Notes
0
cnc up top to gather supplies and such (the such was pretty fun chris says, and the bathroom closet has been tested)
8/22/08
300.55
Woodstove, Heat & Showering '08
0.5
shower was warm today. woohoo!!!!
8/22/08
213.12
Utility shed built
3.5
chris got the bucket-o-brown goop (dynoseal) out of us and put by steps for cass. she brushed it on, wearing bug netting hat and shirt and mask and gloves. bucket precarious at points. hard to see well thru netting. one side done. two sides have coat up to as far as could reach on bucket. used up what had poured out.
8/22/08
213.85
Radiant flooring 30': fins installed
0.75
stapling up of fins commences. difficult to see with netting on head, and stapler kept jamming
8/24/08
329.04
Loft access Building
1
done sanding posts
8/24/08
742.01
JaBoSTH: Non-Quackers
0.5
nails in window, moving some supplies 'round
8/24/08
275.04
Materials transport/inventory
0.75
roof panels stored.
8/24/08
213.12
Utility shed built
4.5
roof panels installed
8/24/08
300.55
Woodstove, Heat & Showering '08
0.5
8/24/08
329.02
Construct walls and loft - 30' yurt: wallboards
0.25
under shelf board is ratcheted in place for install
8/28/08
275.04
Materials transport/inventory
1
toilet is bought
8/29/08
275.04
Materials transport/inventory
1.25
stuff up to MLA
8/29/08
213.12
Utility shed built
1.5
shiplapping
8/29/08
742.01
JaBoSTH: Non-Quackers
0.5
8/30/08
213.5
Construct power house
0.5
trimmed fascia, checked wall size to determine if US scraps could be used...nope.
8/30/08
742.01
JaBoSTH: Non-Quackers
0.5
8/30/08
213.12
Utility shed built
1.75
8/30/08
213.36
Site cleanup (general and for Cass safety)
0.25
8/30/08
213.82
Radiant flooring 30': loops installed
3
done!
8/30/08
213.85
Radiant flooring 30': fins installed
2.5
8/30/08
213.86
Radiant flooring US: fins installed
0.5
8/30/08
306.01
Determine tasks she can do during week alone
0.5
8/30/08
300.55
Woodstove, Heat & Showering '08
0.5
8/30/08
288.09
Cut and store downed trees
0.25
8/30/08
0
Notes
0
chris does not accept any nonsense about leaves turning colors. it was gross out today. the coooler is structurally sound. mosquitos suck ass.
8/31/08
213.5
Construct power house
7.5
mark, cut and seal roof plywood. install end fascia and last ceiling joist. start installing roof panels but rafter alignment is outta wack with panel length. add a sister-rafter. this helps but on two sections Chris puts it on wrong main rafter. D'oh. ne panel is in and another positioned but darkness puts an end to fine tuninf before nailing.
8/31/08
325.02
Baking Soda MLA Shrooms
0.5
8/31/08
213.12
Utility shed built
1.5
continued roof install and brown goo on south wall. marked shiplap for last wall, cut overage on in-place shiplap
8/31/08
288.09
Cut and store downed trees
1.5
sealing wood crib lumber and splitting logs
8/31/08
300.55
Woodstove, Heat & Showering '08
0.5
8/31/08
329.05
Loft Bathroom Windows
0.5
marked for cutting
8/31/08
213.69
Construct walls and loft - 30' yurt: floorboards
0.25
reviewed for cutting
8/31/08
329.02
Construct walls and loft - 30' yurt: wallboards
1.75
marked boards for house cutting, installed a few boards and worked on svv panel wall
8/23/08
0
Notes
0
chris back late last night from house day. he is soo tired. after getting up early-ish to do the yurt close-up/xterra drive-up, he naps. usual sat am chores in park ave (always take longer than the c's wish it would) humid, but sunny summery day after the dense fog of morn burned off. cass has a nice warm shower using her new method and what with the summery sunny weather again. the xterra serenades cnc while they work on US dynosealing (brown goo) with some new tunes.
8/24/08
0
Notes
0
nother sunny summery type of day. cool to start. cnc enjoy a very nice breakfast! sitting on chairs outside on park ave in sunshine. ahhh. radio brought out to play the puzzler. nice normal people breakfast. well...normal if cnc were done. anyway... cnc have some more enjoyable times on the deck bouncing around and inside the cooler, non buggy yurt. xterra serenade again while doing US work. chris so stoked about the progress! wishes he could take tomorrow off so cnc could finish! but alas, nope. chris leaves early this wk (6:30pm today) for work. weird schedule, and short weekend, but cnc got many dependencies out of way.
8/25/08
0
Notes
0
cloudy n cool AM means cold showering. cleared some different times in afternoon. tomorrow sposd to be sunny.
8/25/08
742.01
JaBoSTH: Non-Quackers
0.75
setup. shutdown. misc putting away of things from wkend. calling to get paint for doors
8/25/08
329.02
Construct walls and loft - 30' yurt: wallboards
2
shelf underboard installed. one more bath wall board up
8/25/08
213.71
Walls - 30' yurt: sand and finish
4
washing off posts that chris said are finished. stained all
8/25/08
329.05
Loft Bathroom Windows
0.5
aspen all up on one side, ready to sand and finish and await plexiglass
8/25/08
300.55
Woodstove, Heat & Showering '08
0.5
mitigated some of coldness by getting out from pipe the slightly warmer than stuff indoors water and insulating
8/26/08
0
Notes
0
cold all AM. cass long underwear in AM and evening. cold showering due to such cold air. frost warnings -in northern valleys, hopefully yippeeland won't have it.
dis-jointed day: cass has phone appt with health practitioner midday, unexpectedly cnc talk for only 4mins at lunch. chris driving back from buffalo. weird day
8/26/08
742.01
JaBoSTH: Non-Quackers
0.25
setup. shutdown.
8/26/08
300.55
Woodstove, Heat & Showering '08
0.5
not overly warm, prob wouldve been ok-ish showering except for frigid air. cass shivering
8/26/08
213.71
Walls - 30' yurt: sand and finish
2.5
topcoat on part of steps, first coat on aspen for windows
8/26/08
288.09
Cut and store downed trees
2.5
watershield onto 2*4s for chris to use in woodstacking cribs
8/26/08
213.12
Utility shed built
1.5
got started on 6' siden tricky starting solo. got worked out and .....after going thru stack, turns out only 3 shiplap long enough as cnc discussed install. txted chris to ask which option he wanted to do: buy more 8s and cut, or make sure molding covers gap and seal corners. 2nd option chosen but cass had already cleaned up and it was dewey.
8/26/08
213.85
Radiant flooring 30': fins installed
1.25
geesh, hope we have enough fins.
8/27/08
0
Notes
0
cold all AM. cass long underwear in AM, warmed up more than yesterday tho, so only sweatshirt in eve.
skeeters skeeters skeeters argh argh argh argh!
8/27/08
742.01
JaBoSTH: Non-Quackers
0.25
setup. shutdown.
8/27/08
300.55
Woodstove, Heat & Showering '08
0.5
forgot to do, did late. only used the jugs not pipe.
8/27/08
213.12
Utility shed built
1.75
one 6' side done except for top board. was going to nail in rest of 8' side but the boards pulled out of line. hmmm.
8/27/08
742.02
JaBoSTH: Quackers
1.75
cass takes timeout bldg day to do draft email for bank, cnc review at lunch and chris sends.
8/27/08
213.85
Radiant flooring 30': fins installed
1.5
more stapling to cranked tunes
8/27/08
213.71
Walls - 30' yurt: sand and finish
2.5
topcoat on rest of stained steps parts, 2nd coat on aspen for windows
8/28/08
0
Notes
0
cnc have a nice night of sleeping together midweek, a rarity! chris slit time this wk for work and is working local for rest of wk.
skeeters skeeters skeeters argh argh argh argh!
cass short day, as chris is local and planning to be back by 9pm
8/28/08
742.01
JaBoSTH: Non-Quackers
0.75
setup. shutdown. misc tasks that didnt take full 15mins(such as cleaning up aspen and paper). calling for paint.
8/28/08
213.12
Utility shed built
2.25
worked on 2nd 6' side but stopped because (is a thurs anyway and had to) but also, lack of boards. have 2 6' left but each has problem and should be used elsewhere-on front.
8/28/08
213.69
Construct walls and loft - 30' yurt: floorboards
0.25
marked straight edges for cutting
8/28/08
300.55
Woodstove, Heat & Showering '08
0.25
not very warm. argh...
8/28/08
305.04
Daitomaceous earth
0.25
ants trail in and out by stone near US pipes, got cupful of d.e. while down doing water, (split time) and sprinkled over area
8/29/08
0
Notes
0
chris home early last night (barely past 10pm!), thanks to working local today. nice! had time to read and chat.
chris resorts to flannel pants and a winter hat for breakfast attire.
cnc get to work together a bit before friday task leave.
8/29/08
742.01
JaBoSTH: Non-Quackers
0.75
cass looks up #s and calls places and ends up ordering paint for door
8/29/08
300.55
Woodstove, Heat & Showering '08
0.25
not warm at all. argh...
8/29/08
213.7
Construct walls and loft - 30' yurt: mouldings
3
measuring and marking for chris to take to house to cut
8/29/08
329.02
Construct walls and loft - 30' yurt: wallboards
0.5
figuring out for bathroom/loft shelf side. hmmmm..... started marking wallboards (chris said should cut those at house too)
Project YIPPEE - An Adventure in Safe Living
Copyright 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010 & - gods when will this end - 2011