06/18/06 - Sunday
Cassandra, Queen of the Mix
Notes
- HOT n very very HUMID
- Moldy hay taken away from US, their svc as insulator well past
- Lunch break in sSIPPEE, C+C thoroughly soaked. Eat because know need the energy but neither hungry.
- sSIPPEE is hotter than outside...better screening inhibiting the miniscule mostly nonexistant breezes? and no cupola/vent up top in this one. But at least is a place to be bug-free and not have to clean up (like in yurt).
- Lots of carpenter ants. Grrr.
- When so miserably humid n hot should Not bother heating shower water! Cass got overheated at night, after hot shower, after a long long day of being mega heated. Resort to opening dome + door a while, not great idea since noseeum netting not up yet.
- So exhausted
- Late Night Yoga session!
306.02 Test on safety: materials and tools
- Cass safe for footing tools and materials except drainage pump hose
300.28 Shower arrangements on-site
- Filled up new Reliance solar shower and set in sun
- No, it doesn't work
- Time: 0.25 hrs
Chris, Master of the Trowel
213.01 Footings
- Chris footing tubes out shed and up
- Cass chores and up to join in
- Cass backfill forms and then mixing cement while Chris doing setups, filling tubes. Chris gets cement + water.
- Ouch! Damn bugs! Nasty bites at Cass wrists where she hadn't hooked up gloves/bugshirt properly. Wish we could work w/o all the bug attire!
- Decide to work late (finished a bit after 9pm), will mean other tasks postponed, but need to make progress w/footings!
- did 10 w/ CM help
- Chris clogs drainage pump on second use. Fortunately, pump fixes itself before Chris can attempt repairs.
- time: 10.5 hrs
Black Flies - Scourge of the Construction Zone
|