06/10/06 - Saturday
Chris marvels at the presence of enough sun to create a shadow
Misc Notes:
- Raining again. Cool, very humid.
- Chris trnpt deck boards up to MLA, then over to Poocham to get yesterday's laundry(not dry due to w/d prob), fill water jugs(as backup due to repl filters not arriving), then take trash/recycling
- Cass am + sat chores. Filling 5gal jug took well over 1hr. No phone signal.
- Loud 'mowing lawn' sound again. Ugh.
- Lunch when Chris back. During, saw enough hazy sun to make a shadow. No such luck that it stayed though.
- Site work at MLA in afternoon.
- Cold, two batched rocks, dinner + tea, treat Chris
- Got to bed on schedule (wow!), but then awake much longer (wow!)
275.04 Materials Transport/inventory
- boards unloaded at MLA
- Moose does the neutral rolldown without engine running.
- Cass stayed in yurt with windows closed
- 50 more deck boards loaded and relocated to Vermont
- time: 90 min
Cass completes her fourth footing hole
213.01 Footings
- C&C dug more holes
- drill pump doesn't have enough juice to suck water uphill thru a 1" PEX tube. Perhaps a smaller tube?
- time: 4 hrs
- one seems to be above/near curtain drain.
- another might be right over MLA water and RF pipes.
303.08 Troubleshoot: water coming out of U.Shed corex and/or at least divert
- reconfigured temp drain corex
- time: 30 min
303.10 Fix for water at bottom of steps by woodshed
- dug trench to route water away
- time: 0.25hr
Chris digs digging
|