06/09/06 - Friday
Misc:
- Used nailset on most of visible nails.
- Time: ? (15-30)
- Rain all day, heavy at times.
- Cass AM routines and preps for Fri tasks
- Back at 2, snack and beam tasks/files, coordinate, Frollicks, lv at 3:45
- Rain too heavy to work outside. Need to either pay for safe rain gear or ?
- Water filtration v slow and taking l o n g time to fill for various tasks.
- No phone signal again.
275.11 Relocate flooring into bedroom
275.04 Materials Transport/inventory
- 50 deck boards loaded and relocated to Vermont
- time: 90 min
213.27 WC Platform: shape ground for drainage/ lay gravel/stone over site
- worked on corex trench, rain too heavy to do long (can't afford to get clothes soaked w/no way to dry them out)
- Time: 0.5hr

|