06/28/06 - Wednesday
MLA grading
Notes:
- Cassandra sick yest, and totally forgot detoxis. Yikes. Not doing good today either.
- Rain at YIPPEE. Dark, grey sky. Incessantly raining.
- Until the rain ceased late afternoon.
- Spotted some blue in sky by 7pm.
- But was back to rain before day closed at midnight. And rain it did! Downpour accompanied by cracks of lightning and bed-shaking thunder.
[blank]
- Life at YIPPEE: endless bugs, high humidity, rain and phone signal problems. Ugh!
213.27 (MLA/Deck) shape ground for drainage/lay gravel/stone over site
- created space for plants/dirt dumping
- water in one footing hole foamy
- soaked n smelly ground
- Time: 2.25hrs
303.00 Erosion control
- Walk woody way assessing what to do to finish that
- Checked out other areas/ditches. Loud w/all water flowing, but all seems good. Is holding.
- Time: 0.25hr
MLA grading
|